Playing Field Report November 2022                                       APPENDIX C

With the recent rain the football pitches are looking a lot healthier. Regular matches still being played by a mixture of junior teams and the senior men on a Saturday morning but slightly less than previous seasons.

The MUGA is still being used regularly and booking system working well. We still await replacement of the damaged panel.

A revised quote has been received for repairs to the Skateboard Ramp at £1500.00 plus VAT.

Playground safety works are due to be undertaken this week.

A dog training group is now regularly using the pavilion and field.

Replacement of the entrance hall and corridor was recently needed and consideration must now be given to an overhaul of all the internal electrics which have not been replaced since being installed over 50 years ago. Recent works for the MUGA lights and CCTV have been totally separate from the existing internal system.

Car park repairs and extension are still under review as are the provision of seating at the field and playground.

The Charity shop is still providing much appreciated funds for the upkeep of the facilities.

 

Brian Gibbins

17/11/2022